Pluit Dam Re-dredged
access_time November 19 2015 09:59 AM remove_red_eye 1675
Reported by TP Moan Simanjuntak | Translated by Cintya Meliza
Reported by TP Moan Simanjuntak | Translated by Cintya Meliza
Pluit Dam is re-dredged since it has been full of mud and water hyacinth or locally known as eceng gondok. The dredging used 10 heavy equipments typed amphibious excavator swamp backhoe.
The mud is already quite high thus it makes the dam shallowing
"The mud is already quite high thus it makes the dam shallowing," said Head of North Jakarta Water Management Sub-Department, Kasna, Wednesday (11/18).
Several Connecting Channels in E. Jakarta Have Not Dredged
He hoped, after the dredging is done, the dam could
reserve more water thus it could speed up water receding on flood points.